← All articles · Estepona · 4 min read

Estepona Breaks Ground on Its New Velodrome, Football and Rugby Complex

Estepona broke ground on 15 July on a new velodrome, football and rugby complex beside the Monterroso stream and the Camino de las Mesas, when Mayor José María García Urbano laid the first stone. The complex will combine a cycling track, a full size football pitch and the first dedicated rugby facilities the town has ever had.

It sits within a periurban park of more than 20,000 square metres, built around an oval cycle stadium. The banked track will be ringed by tiered stands with an initial capacity of around a thousand spectators, and the main building will house changing rooms, a gym, offices, storage and public toilets.

Architectural render of the Estepona velodrome showing the cycling track around the football and rugby pitch
The project render: a banked cycling track wrapping around the new football and rugby pitch, with the landscaped park beyond.

Next to the track, a latest generation artificial turf pitch has been designed to host both rugby and 11 a side football. The playing field follows the technical standards set out by Spain’s Higher Sports Council (the NIDE regulations), while the cycling track itself is being built to the specifications of the UCI, the sport’s international governing body. In other words, this is a facility intended for serious competition, not just weekend use.

Timeline and investment

The project has been moving through the pipeline since 2025, when the town hall first put the works out to tender, and construction actually began in early June, starting with the groundwork: connecting the plot to water, sewerage and electricity. The contract was awarded to UTE Parque Estepona for 3,652,569.85 euros including VAT, and the winning bid shortened the original schedule. The full build is now expected to take nine months, which points to completion during 2027.

For local riders, this has been a long time coming. Cycling clubs and athletes joined the mayor at the ceremony, and the town hall acknowledged that a proper cycling facility has been a demand from professionals and enthusiasts for decades.

Mayor of Estepona and local cycling clubs at the first stone ceremony of the new velodrome site
Mayor José María García Urbano with local clubs and cyclists at the first stone ceremony on the velodrome site.

A bigger plan for the Monterroso corridor

The velodrome is one piece of a wider transformation in the northwest of town. The council is working on a project to integrate the Monterroso river into the urban fabric, creating a public area that will link up with the Parque Ferial y Deportivo and with the town centre itself.

Housing is part of the same push. The town hall is processing a planning modification that would release land for around 300 subsidised homes (VPO) in the Monterroso area, adding much needed affordable housing alongside the new sports and leisure facilities.

What this means for Estepona

Projects like this one are a good reminder of why Estepona keeps climbing the rankings of places to live on the Costa del Sol. The town has spent years investing in everyday quality of life, from parks and sports facilities to schools and healthcare, and that investment shows in how the property market here has matured. If you’re getting to know the area, our Estepona area guide is a good place to start, and the Casco Antiguo and Altos de Estepona guides cover two of the town’s most distinctive neighbourhoods. And if you’d like to see what new build homes look like here, take a look at Maralto, a contemporary development of apartments and penthouses with sea views close to the town centre.

Estepona’s health infrastructure is expanding alongside its sports facilities — Hospiten has just expanded its eye unit — and up the road, Benahávis has finally got its road sidewalk.

Questions people are asking

Where is Estepona’s new velodrome being built?

Beside the Monterroso stream and the Camino de las Mesas, within a periurban park of more than 20,000 square metres in the northwest of town.

When will Estepona’s velodrome be finished?

Construction began in early June 2025 with a nine-month build timeline following the first-stone ceremony on July 15th, pointing to completion during 2027.

What facilities will the new complex include?

A UCI-standard banked cycling track with tiered stands for around a thousand spectators, a full-size football pitch built to NIDE technical standards that also hosts rugby, changing rooms, a gym and public toilets.

How much is Estepona spending on the velodrome complex?

The contract was awarded to UTE Parque Estepona for 3,652,569.85 euros including VAT.

Is this Estepona’s first rugby facility?

Yes, this will be the town’s first dedicated rugby facilities alongside the football pitch and cycling track.

Is housing part of the same development area?

Yes. The town hall is processing a planning modification that would release land for around 300 subsidised homes (VPO) in the same Monterroso area.

Questions about this topic?

Mar Sipos and the team are happy to help.

Talk to us →